Bathroom installation Kimbolton
This beautiful bathroom in Kimbolton took a duration of 10 working days days to complete.
Working along side the client, we designed a stunning bathroom that incorporated a wet room shower area.
This wasn’t the easiest of bathrooms to work on as all the wastes had to be installed above floor level. This was due to existing pipework being present in the screed, which we didn’t want to disturb.
We installed a loose wire Warmup underfloor heating kit, which we feel is essential in any Wetroom. Not only is it an extremely cost effective method of heating the room, it also creates a comfortable environment . The floor radiates warmth, heating the room evenly.
The mosaic tiles were sourced from Fired Earth, the Laura Ashley sanitary ware was supplied by QP Interiors based in Bedford.